What size skip bin do I need?
Most home clean-outs suit a 3m³ or 4m³ bin; renovations usually need a 6m³. Heavy loads like concrete or soil need a smaller bin than you'd think, because of the weight.
| Size | Roughly holds (240 L wheelie bins) | Good for |
|---|---|---|
| 2m³ | About 8 | Garage or shed tidy, garden clean-up, small bathroom strip-out |
| 3m³ | About 12 | One or two rooms cleared, small renovation |
| 4m³ | About 16 | Whole garage, kitchen or bathroom renovation |
| 6m³ | About 25 | House clean-out, larger renovation, big garden job |
Heavy waste: rubble, soil, landscaping and mixed loads
Heavy bins can only be filled part-way so the truck stays within its legal load: about 60% on a 2m³ or 3m³, about half on a 4m³ and about 40% on a 6m³ (wet soil: about half up to 4m³, about a third on a 6m³). For heavy jobs, a 2m³ or 3m³ is often the right choice.
Bin dimensions · Work out your price
Questions
Is it better to go bigger?
If you're unsure between two sizes, the bigger one is usually cheaper than a second bin later.
Can I mix general waste with concrete?
Yes: book the Rubble and rubbish mix bin, or (usually cheaper) a Rubble bin and a General and building bin delivered together. A concrete bin with rubbish in it is charged as the Rubble and rubbish mix bin.